On 1 June 2016, after seventeen years of work, the Gotthard Base Tunnel was opened: 57 kilometres with twin tubes, dug almost on the level beneath the massif, up to 2,300 metres below the surface. It is the heart of AlpTransit, the New Rail Link through the Alps approved by the people in 1992.
A tunnel wanted by the citizens. In Switzerland major projects go to the ballot box, and AlpTransit was no exception. On 27 September 1992 the people approved the New Rail Link through the Alps, with the Gotthard and Lötschberg base tunnels, by 63.6 per cent. On 20 February 1994 they accepted, by 51.9 per cent, the Alpine Initiative, which wrote into the Constitution the transfer of transit freight from road to rail. On 29 November 1998, by 63.5 per cent, they approved the funding of the major public transport projects. Without these three votes the longest railway tunnel in the world would not exist: it is a work decided by the citizens.
On 15 October 2010 the boring machine digging from Faido reached the one that had set off from Sedrun: this was the main breakthrough, followed live all over Switzerland. The four large tunnel boring machines used on the site dug more than 85 kilometres of tunnel through the rock in all.
Trains cross the Alps without climbing, freight moves from road to rail, and Lugano and Milan come closer to Zurich. One hundred and thirty-four years after the first tunnel, the Gotthard is once again the symbolic passage between north and south.